UNDER RAILWAYS, TRANS AND URBAN MASS TRANSIT VEHICLES SUPPLY AND MAINTENANCE OF HIGH SPEED TRAINS, REGIONAL TRAINS, DIESEL LOCOMOTIVES, ELECTRICAL LOCOMOTIVES, MONO RAIL VEHICLES AND TRAMWAY VEHICLES;

  • ANKARA LIGHT RAIL SYSTEM TRAINS SUPPLY
  • KAYSERI LIGHT RAIL SYSTEM TRAINS SUPPLY
  • SAMSUN LIGHT RAIL SYSTEM TRAINS SUPPLY
  • MERSIN – TOPRAKKALE – YENICE – BOGAZKOPRU RAILWAY LINE (430 KM)
  • EXECUTION REHABILITATION WORKS
  • LINE EXTENSION WORKS
  • INSTALLATION SIGNALING  SYSTEM
  • 600 KM COVENTIONAL RAILWAY LINE UPGRADING OF TRACKS OF T.C.D.D. OF TURKEY GOVERNMENT RAILWREPUBLICAYS
  • KAYSERI SECOND PHASE TRAMWAY TRACK WORKS
  • SIGNAL & TELECOMMUNICATION WORK OF ENTIRE LINE OF ANKARA EAILWAY SYSTEM
  • LOCOMOTIVE ON BOARD SIGNALING SYSTEMS OF TURKISH RAILWAYS LOCOMOTIVES
  • ISTANBUL ANKARA HIGH SPEED TRAIN LINE 2ND PHASE SIGNALIZATION
  • ADANA MERSIN KAYSERI CONVENTIONAL RAILWAY LINE SIGNALING & COMMUNICATION SYSTEMS
  • PIRI REIS HIGH SPEED LINE LABORATORY TRAIN SUPPLY & OPERATION
  • CONVENTIONAL LINE DIAGNOSTIC TRAIN SUPPLY & OPERATION
  • RAIL ULTRASONIC MEASUREMWNT VEHICLE SUPPLY & OPERATION
  • THREE UNITS OF AUTOMATIC TRAIN INSPECTION SYSTEM SUPPLY & MAINTENANCE
MERSIN – TOPRAKKALE & YENICE – BOGAZKOPRU RAILWAY LINE INSTALLATION OF ENERGY AND SIGNALIZATION SYSTEMS

  • INSTALLATION AND COMMISSIONING OF TECHNICAL ROOMS (34 UNITS)
  • INSTALLATION AND COMMISSIONING OF TRANSFORMER BUILDINGS (116 UNITS)
  • INSTALLATION OF CONCRETE CHANNELS: 82.500 M
  • INSTALLATION OF SOIL CHANNELS: 131.350 M
  • INSTALLATION OF STEEL CHANNELS: 2.900 M
  • INSTALLATION OF STEEL CHANNELS: 1.292 UNITS
  • INSTALLATION OF RAIL CIRCUITS: 296 UNITS
  • INSTALLATION OF CAPACITORS: 848 UNITS
  • EXISTING ROAD AND RAILWAY UNDERPASSES: 961 UNITS
INSTALLATIONS OF AUTOMATIC TRAIN INSPECTION STATIONS ON RAILWAY LINES IN ANKARA, AFYON AND MALATYA CITIES

  • INSTALLLATION OF MEASUREMENT EQUIPMENT
  • WIRING WORK
  • COMMISSIONING OF THE SYSTEM
DESIGN AND CONSTRUCTION OF INDUSTIRAL BUILDING (CLOSED AREA IS 7000 m²)
UNDER RAILWAY & URBAN MASS TRANSIT SYSTEMS PLAN DESIGN & CERTIFICATION COMPLATED PLANS

  • ANKARA MASS TRANSIT PLAN & WORKS
  • KAYSERI MASS TRANSIT PLAN & WORKS
  • SAMSUN MASS TRANSIT PLAN & WORKS

COMPLATED DESIGN & ENGINEERING WORKS

  • DESIGN & ENGINEERING OF ANKARA METRO SYSTEMS
  • DESIGN & ENGINEERING OF ANKARA TRAFFIC MANAGEMENT SYSTEMS

CERTIFICATION WORKS

  • CERTIFICATION OF SEIMENS HIGH SPEED TRAINS
  • CERTIFICATION OF CAF HIGH SPEED TRAINS
  • CERTIFICATION OF ANKARA KONYA HIGH SPEED LINE
  • CERTIFICATION OF ISTANBUL HIGH SPEED LINE

Infrastructure Works

1- Bridge and viaduct works (bridges, viaducts, lower and overpasses, AKEDUKS)

2- Tunnel works (road and railway tunnels, water transmission, dervation and strength tunnels, wastewater tunnels, sea and river tunnels, macro tunnels, gallery, gallery and SHAFT)

3- PIPE AND TRANSMISSION LINE WORKS (OIL AND GAS PIPELINES AND NETWORKS, WATER TRANSMISSION LINES)

4- DRINKING WATER AND SEWERAGE WORKS (SEWER NETWORKS, RAINWATER NETWORKS, DRINKING AND USE WATER NETWORKS, MICROTUNNEL WORKS) AIRPORT WORKS (AIRPORT RUNWAYS, AIRPORT APRON AND TAXIRUT CONSTRUCTION)

OUR PROJECT & COMMITMENT SERVICES
• Process Design, flow charts, P&ID drawings and equipment selections.
• Creating Work Procedures and Construction Instructions.
• Detailed engineering calculations and drawings.
• General Infrastructure Piping Works (HDPE, GRP, Steel, Geothermal etc. Piping)
• Mechanical Works.
• Manufacturing and assembly of welded equipment.
• Manufacturing and installation of Sea Outfall and Sea water intake structures.
• Construction works of infrastructure piping works.
• Garbage storage areas